The hallway is set up with tile and there should be a hardwood to be included with the tile. The standard for subfloor quality is very poor. To improve the standard the lower spots should be patched well. After that the final leveling is done.
~~~~~~~~~~~~~~~~~~~~~
Published By
Arka Roy
www.constructioncost.co
~~~~~~~~~~~~~~~~~~~~~