Paper Work
The paperwork for the building needs to be finished even before the work actually begins. This includes:-
- Preparation of drawings and diagrams
- Material and construction cost estimation
- Labor costs and contingency measures
- Approval of design from local development authority
- Any other legal work that may be necessary
Layout Marking
The plan boundaries need to be marked on the ground. Only the approved plan should be marked down. The ground inside and outside the point should be gutted of any undesirable rudiments. Accurate confines and exposures must be followed while marking down the layout.